Chandrayaan-1

Launch: October 22, 2008             Site: Satish Dhavan Space Centre, Sriharikota

The objectives of the programme were:

  1. To develop and orbit a spacecraft around moon using an Indian-made launch vehicle.
  2. To prepare a three-dimensional atlas of both the near and the far side of the moon.
  3. Chemical and mineralogical mapping of the entire lunar surface.
  4. To study the impact of Moon Impact Probe on the surface of the moon as a fore-runner to future soft landing missions.

NASA’s Moon Mineralogy Mapper (M3) had on Chandrayaan-1 had detected water on the surface of moon. The mission was expected to last two years. However, the communication with the satellite was lost on 29 August 2009 and the mission was declared over. It lasted for 312 days and achieved 95 percent of its objectives.

Chandrayaan-1 was selected by the American Institute of Aeronautics and Astronautics (AIAA) as one of the recipients of its annual AIAA SPACE 2009 awards for contributions to space science and technology.

Read moreChandrayaan-1

14 Sep Current Affairs

ALAMGIRPUR  , BAGHPAT-

  • In Uttar Pradesh is an archaeological site discovered in 1957.
  • It showed for the first time evidence of habitation pertaining to the Harappan period in the upper doab between Ganga and Yamuna
  • It recently faces destruction by The villages who have destructed the century old structure to expand their cultivable land
  • ASI found ceramic items like roof tiles, dishes, Terracotta cakes and figures of humped bull and snake .

Read more14 Sep Current Affairs

Android App for RAS Prelims and Mains 

-Rajasthan GK (History, Geography, Economy and Polity)
-RAS Prelims Notes
-RAS Current Affairs
-Daily Mains Practice Questions (DMPQ)
-Daily Prelims Practice Questions (DPPQ)
-Mains Topic wise Notes for All RAS GS Papers

Install Now on

[email-subscribers-form id=”1″]