The Japan International Cooperation Agency (JICA) which undertook the study on the feasibility of this prestigious project, submitted its report in July 2015. The project was approved by the Cabinet Committee on Economic Affairs, in December 2015, to be implemented with Japanese technical and financial assistance. The memorandum of understanding for cooperation between India and Japan was signed on 12th December 2015. A new special purpose vehicle with 50 per cent equity participation from the Ministry of Railways and 50 per cent from the state governments of Maharashtra and Gujarat was to be set up to implement the project.
- Project implementation time will be approximately seven years from the commencement of construction.
- Japanese official development assistance will be ₹ 79, 165 crore (81 percent fof project cost) for 50 years with 0.1 per cent interest and a 15-year
- Certain identified packages would have either a Japanese company as prime contractor or a Japanese-led JV.
- Certain identified goods manufactured in Japan would be procured from
- Total length of the proposed corridor is 508 km between the Bandra Kurla complex d="M549.7 124.1c-6.3-23.7-24.8-42.3-48.3-48.6C458.8 64 288 64 288 64S117.2 64 74.6 75.5c-23.5 6.3-42 24.9-48.3 48.6-11.4 42.9-11.4 132.3-11.4 132.3s0 89.4 11.4 132.3c6.3 23.7 24.8 41.5 48.3 47.8C117.2 448 288 448 288 448s170.8 0 213.4-11.5c23.5-6.3 42-24.2 48.3-47.8 11.4-42.9 11.4-132.3 11.4-132.3s0-89.4-11.4-132.3zm-317.5 213.5V175.2l142.7 81.2-142.7 81.2z"/> Subscribe on YouTube